London · Greater London

Documented commercial door work across London

Avanti Doors has completed documented commercial door work across London, swing door automation at Dolphin Square in Pimlico, roller shutter replacement in Central London, automated bi-folding gates in Wandsworth and a gate overhaul in South London, and can quote for planned maintenance and scheduled installation work at suitable Greater London sites.

Commercial vehicle barrier with the Canary Wharf skyline, illustrating a managed London access point

24/7 emergency support

Clear surveys and quotations

Commercial door engineers

East Anglia-based commercial team

Commercial door priorities in London

Built around the site, the risk and the people responsible

Priorities shaped by the commercial sites, operating patterns and access constraints Avanti is set up to support across London.

Automatic swing door entrance automated by Avanti Doors at Dolphin Square, Pimlico
Documented Avanti project

For residential and managed-building facilities managers

Automate multiple entrances while the building stays in use

Operational need
A large Pimlico residential development needed five pairs of entrance doors automated while residents kept using them throughout.
Relevant Avanti support
Avanti installed Dorma swing operators with Flatscan 3D laser safety, slimline mag locks and battery back-up across all five entrances, wired each for fire-alarm release and commissioned the system for safe use over five working days.
View the documented project
Commercial roller shutter photographed for Avanti's documented Central London replacement project
Documented Avanti project

For retail and commercial property managers

Replace a non-compliant shutter around site operations

Operational need
A Central London commercial opening required its existing shutter replaced with access, fall-protection and finish requirements incorporated into the new specification.
Relevant Avanti support
Avanti supplied a tubular-operated shutter with wicket door, anti-fall safety brake, manual override and agreed PPC finish, scheduled around the site's working requirements.
View the documented project
Automatic sliding steel gate repaired during Avanti's documented South London overhaul
Documented Avanti project

For security, estate and controlled-access managers

Recover a sliding gate with mechanical and control faults

Operational need
A South London automatic sliding gate required worn running gear, electrical controls and safety components overhauled rather than treated as an isolated motor fault.
Relevant Avanti support
Avanti replaced wheel assemblies, anti-tilt rollers, the control panel and safety edges, recommissioning both motors and completing the recorded project in two working days.
View the documented project

Local commercial door specialists

Door installation, maintenance and repairs in London

Commercial door support for London sites, industrial estates and managed facilities.

Documented London projects

Avanti Doors can point to five documented London projects: automating five pairs of entrance doors at Dolphin Square in Pimlico, replacing a non-compliant roller shutter in Central London, fitting a new double-glazed aluminium entrance with automatic swing operators in East Central London, installing automated bi-folding security gates at a Shurgard self-storage yard in Wandsworth, and carrying out a full mechanical and electrical overhaul of a sliding automatic gate in South London.

The Dolphin Square automation covered five pairs of Dorma ED100A swing door operators with radar activation, Flatscan 3D on-door laser safety sensing, slimline magnetic locks and 1000VA battery back-up, each doorset wired to open on a fire-alarm signal and commissioned against BS EN 16005 safety-in-use requirements. Two engineers worked over five days while the development stayed in use. The Central London roller shutter replaced a unit described in the project record as non-compliant, with a PPC finish, integrated wicket door and anti-fall safety brake; the work was scheduled around trading hours. The South London gate overhaul, new wheel assemblies, anti-tilt rollers, a new control panel and safety edges, was completed in two working days.

The linked project pages record the equipment and completed scope for each job. They give facilities teams a concrete starting point when discussing a similar entrance, shutter or controlled-access requirement in London.

How we cover London from Norfolk

We are straightforward about geography. Avanti Doors is based in West Lynn, near King’s Lynn, and London sits at the outer edge of our travel range. That shapes how work is structured: London is primarily project-, scheduled-maintenance- and contract-led rather than presented as an “engineer round the corner” service.

For installations, refurbishments and automation projects, the work is surveyed, specified, scheduled and delivered on agreed dates, as the documented Pimlico and Central London installations were. For servicing, planned maintenance agreements let visits be grouped efficiently across a portfolio. For faults, the team confirms what attendance is practical against the postcode, urgency and current route; contracted response targets apply only where they are written into the individual agreement.

Plan safety checks and maintenance around the system

Managed offices, retail frontages and shared service yards can combine high footfall with landlord, access and reporting requirements. BS EN 16005 sets safety-in-use requirements for power-operated pedestrian doorsets; the applicable maintenance and testing scope depends on the equipment, its use, the site risk assessment and current guidance. The documented Central London shutter project also shows a case where Avanti replaced equipment described in the project record as non-compliant.

A planned maintenance arrangement helps keep that risk visible. A mixed London estate, one manufacturer’s operators at the front entrance, another’s shutters on the loading bay and a different gate system on the car park, can be surveyed and scoped under one servicing schedule, with consistent documentation for landlords, insurers and building managers.

Start with a survey or a quote

If you have a London installation project, a portfolio that needs a maintenance agreement, or a door, shutter or gate fault, send the door types, site addresses and photographs if you have them. The team will confirm any survey requirements before preparing the quotation, and larger projects can be programmed around the building’s access constraints, including out-of-hours working where agreed.

Supporting site references

Identify and brief a London site

These map links support site identification and maintenance-round planning. They are supporting logistics, not the reason this service page exists.

Common questions

Commercial doors in London FAQs

Quick answers for facilities managers planning repairs, maintenance or new door work.