Maintenance Contracts

Door Maintenance Contracts

One contract for the doors, shutters, gates and barriers across your estate: planned PPM, response priorities in writing and one service record, across East Anglia, Essex, London and further afield.

Avanti Doors van attending a contracted commercial site

24/7 emergency support

Clear surveys and quotations

Commercial door engineers

East Anglia-based commercial team

Door maintenance contracts

One contract for the assets in scope

An automatic door maintenance contract with Avanti Doors can place the surveyed doors, shutters, gates and barriers across your sites under one agreement: planned preventative maintenance at agreed intervals, defined reactive cover and a consistent service record. The asset survey confirms exactly what is included before the contract starts.

Sound familiar?

Why estates move their doors onto one contract

The problems facilities and estates managers bring to us are rarely about one broken door.

Five contractors, five standards

One firm for the entrance doors, another for the shutters, a third for the gates and barriers, each with its own paperwork and call-out terms.

Job sheets missing at audit

The insurer or fire risk assessor asks for maintenance records and they are scattered across inboxes, or never arrived.

No reliable asset list

Nobody is sure how many powered doors, shutters and barriers the estate has, what make they are or who installed them.

Call-out terms you cannot hold anyone to

"We'll get someone out" is not a response time. Priorities and targets should be in writing before a door fails.

What's covered

What the contract can include

Planned visits, reactive terms and documentation can be agreed around the surveyed asset register and the needs of each estate.

Scheduled PPM visits , Avanti Doors

Scheduled PPM visits

Planned preventative maintenance at agreed intervals, with the relevant components inspected, adjusted and tested to the written scope.

BS EN 16005 safety checks , Avanti Doors

BS EN 16005 safety checks

Where applicable, powered pedestrian-door force, sensor and safety-device checks can be included and documented in the agreed scope.

Written service records , Avanti Doors

Written service records

A documented report records the work completed and supports the site's maintenance, audit and safety files.

Priority reactive call-out , Avanti Doors

Priority reactive call-out

Priority 1 faults (site not secure) targeted within 24 hours and other failures within 48 hours, with contract-specific targets written into your SLA.

Mixed-equipment estates , Avanti Doors

Mixed-equipment estates

The initial survey records each make, model and condition so varied equipment can sit under one clear scope.

Flexible visit schedules , Avanti Doors

Flexible visit schedules

Visit frequency is agreed for each asset and planned around trading hours, deliveries and site access rules.

Response targets

Response priorities in writing

Every call is triaged by priority. These are our standard attendance targets; contracted sites can have their own targets and coverage hours written into the SLA.

Avanti Doors response priorities and attendance targets
PriorityWhen it appliesTarget
Priority 1Site not secure or unsafeSecurity-critical faults: a shutter or gate that will not close, a door that cannot be locked.24 hours
Priority 2Door, gate or barrier failedReactive faults that disrupt access, deliveries or trading but leave the site secure.48 hours
PlannedPPM and compliance visitsQuarterly, six-monthly or annual rounds booked in advance around site access.On schedule
QuotationSurveys and new worksWe aim to issue the written quote within 48 hours once the scope is clear.48 hours

Targets, not guarantees, unless a response time is specifically agreed in your Service Level Agreement.

Compliance we document

Checked and recorded to the right standard

Each asset type is maintained against the standard that applies to it, and every visit leaves a written record for your audit, insurance and fire safety files.

Automatic pedestrian doors

Force, sensor and safety-device checks against BS EN 16005, recorded per door.

Gates and traffic barriers

Safety-in-use checks against BS EN 12453 and the DHF TS 011 code of practice, by Gate Safe trained engineers.

Industrial doors and shutters

Inspection and adjustment of doors within the scope of BS EN 13241, including safety edges, brakes and counterbalance.

Fire shutters

Drop tests and release checks at the intervals the fire strategy requires, with results recorded for the fire risk assessment.

Written maintenance records

Powered doors and gates are work equipment under PUWER, which requires them to be maintained; our service records give you the written evidence.

Multi-site cover

Built for multi-site estates

Whether you manage one distribution centre or a portfolio of branches, the contract is structured around how estates teams actually procure and audit maintenance.

One point of contact

A single accountable contractor for the powered and manual door assets included in the written scope.

Grouped visits across sites

PPM rounds planned so nearby sites are serviced together, keeping disruption low and visit records aligned across your portfolio.

Consistent documentation

The same service-record format for every asset at every site, so audits, insurance renewals and compliance reviews pull from one source.

Regional reach, agreed response

Weekly routes across East Anglia, Essex and London from our Norfolk base, with planned rounds further afield grouped by region and response priorities written into the SLA.

Ready for your supplier list

Constructionline and SafeContractor accreditation, with certificates, insurances and RAMS supplied for vendor onboarding and framework pre-qualification.

Procurement

For buyers working through tenders or frameworks

If your estate is going through a tender, framework or supplier pre-qualification, this is what Avanti can provide.

Accreditation status

Constructionline Gold member and SafeContractor approved, with certificates supplied for your supplier list.

RAMS and insurance documents

Risk assessments and method statements for the sites in scope, with insurance documents supplied for vendor onboarding.

PPM schedule and asset register

The onboarding survey produces the asset register, then the visit schedule and response priorities are written into the contract.

Your questionnaire answered

Send the PQQ or supplier questionnaire and we will answer it from the documents above. If your process needs a named framework or portal, say so and we will confirm what we can provide.

Getting started

How onboarding works

From first walk-round to first planned visit, setting up a contract is a defined four-step process, with the scope, schedule and response commitments agreed in writing before you sign.

  1. 1

    Survey your estate

    We walk the sites in scope with you and record each relevant door, shutter, gate and barrier, including condition and access requirements.

  2. 2

    Build the asset register

    Every asset is logged with make, model, location and condition, giving your contract a clear scope from day one.

  3. 3

    Agree schedule & SLA

    Visit frequency, site access arrangements and reactive response commitments are set out in writing before anything is signed.

  4. 4

    First PPM visit

    Engineers complete the first planned round, baseline every asset and open the documented service record for your estate.

Common questions

Maintenance contract FAQs

Straight answers to the questions facilities and estates managers ask before putting door maintenance under contract.

Google reviews

What customers say about our service visits

5.0 on Google from 13 reviews (opens in a new tab)

  • Andy was excellent during our shutter service and was very professional

    James S. · Google review
  • Had Andy in today to sort out some shutters and a door, he was great very polite got his jobs done quickly. Even noted things that needed sorting etc. Wish all contractors was like him.

    Sarah C. · Google review
  • We had a brilliant service today from Charlie. He was very prompt to assist us in store and help our needs. Charlie was very friendly and informative would highly recommend.

    Bobby M. · Google review
Commercial entrance doors at a business park covered by an Avanti maintenance contract

Start your contract

Put your doors under one agreement

Tell us how many sites and roughly how many doors you manage. We will arrange the survey, build the asset register and provide a clear contract scope and quotation with no obligation.

  • Contract cover
  • Initial estate survey and asset-register scope
  • Clear written contract scope and quotation
  • Priority reactive terms agreed for contracted sites

Accreditations & engineer qualifications

  • IPAF, International Powered Access Federation (engineer qualification)

    IPAF

    Engineer qualification

  • Gate Safe Aware Installer, Gate Safe (engineer qualification)

    Gate Safe Aware Installer

    Engineer qualification

    No. 2373

  • beAccredited, beAccredited.com, Health & Safety Support

    beAccredited

    No. be4355Acc

    Valid to February 2027

  • Acclaim Accreditation, Acclaim / Once For All (SSIP)

    Acclaim Accreditation

    No. 1327405

    Valid to March 2027

  • SafePQQ Verified, Alcumus SafePQQ

    SafePQQ Verified

  • SafeContractor Approved, Alcumus SafeContractor

    SafeContractor Approved

    No. CH6827

    Valid to March 2027

  • Constructionline Gold Member, Constructionline

    Constructionline Gold Member

    Gold Member

    No. 1327405

  • ADSA Member, Automatic Door Suppliers Association

    ADSA Member

    Valid to March 2027

  • DHF Member, Door & Hardware Federation

    DHF Member

    Full Member

    No. 1655

    Valid to March 2027

Certificate details are shown where held on file. IPAF and Gate Safe are individual engineer qualifications, not company accreditations.