Automatic Door Upgrade in Gerrards Cross, Slough
An emergency call-out at a busy high-street store, upgraded to a brand-new bi-parting entrance operator with updated safety sensors, commissioned in half a working day.


Installed: June 2025
A high street entrance, rebuilt fast
Avanti Doors responded to an emergency call-out at a busy high street store in the Gerrards Cross and Slough area. Working around noise restrictions and single-point access, our engineers stripped out the failed operator and installed a complete new bi-parting entrance system, floor guides, track, operator and integrated safety sensors, commissioning it within half a working day.
- New bi-parting entrance operator
- Floor guides and track system
- Updated safety sensors
On site
Equipment used
Removal tools for safe extraction of the old operator
Installation tools for floor guides, track, and operator
Electrical tools for sensor integration and commissioning
Site protection materials to ensure a clean and safe working environment
How it was done
The installation process
- 1
Responded to an emergency call-out at a busy high street store
- 2
Assessed site constraints, including noise restrictions and single-point access
- 3
Removed the existing operator efficiently during standard working hours
- 4
Installed new floor guides and track
- 5
Fitted a brand-new bi-parting operator with integrated safety sensors
- 6
Carried out full commissioning of the new system
- 7
Worked around the store's access and noise restrictions during the upgrade
The outcome
Results & benefits
New bi-parting operator, floor guides, track and sensor package installed
Updated sensors included in the commissioned entrance package
Completed and commissioned within half a working day
Minimal downtime or disruption to store activity
Temporary entrance arrangement replaced with the new operator system
Showcased our ability to deliver fast, efficient results even under tight constraints

Need a similar upgrade?
Plan a safer automatic entrance
Tell us what is failing, changing or slowing the site down and our engineers will shape the right repair, replacement or upgrade route.
- Project handover
- New bi-parting operator, floor guides, track and sensor package installed
- Updated sensors included in the commissioned entrance package
- Completed and commissioned within half a working day